The Yimeng pumped storage hydro projectis located in Xuezhuang Town in Feixian County, approximately 69km away from Linyi city, in the Shangdong province of China The project site lies approximately 24km away from the Feixian Highway and 32km away from the Yimeng substation.
Contact online >>
On October 31, 2021, as the trial operation of Unit 2 ends, the first batch of Unit 1 and Unit 2 of Shandong Yimeng Pumped-storage Power Station constructed by Energy China Gezhouba Group was officially connected to the grid for power
(i) Energy storage is introduced in the scheduling process of hydropower stations in order to stabilize the power generation. If the power generation during the scheduling time period is
Shandong Yimeng Pumped Storage Power Station is located in Fei County, Linyi City, Shandong Province. The total investment of the project is 7.37 billion yuan, the total installed capacity is 1.2 million kilowatts, and 4 single-stage mixed
As the National Hydropower Association (NHA) has well documented (2021 Pumped Storage Report), pumped storage hydro is a vital tool in the renewable energy integration plans of the future. Many utilities already
The Yimeng Pumped Storage Power Station has an installed capacity of 1,200 MW and a designed annual power generation capacity of 2.008 billion kWh. After construction and operation, it can save 56,000 tons of
Hydropower is a traditional, high-quality renewable energy source characterized by mature technology, large capacity, and flexible operation [13] can effectively alleviate the
Pumped storage hydropower (PSH) is a type of hydroelectric energy storage. It is a configuration of two water reservoirs at different elevations that can generate power as water moves down from one to the other (discharge), passing
The amount of energy that can be generated by releasing a unit volume of water from any reservoir equals the multiplication of the water density (ρ), the gravitational constant
As flexible resources, cascaded hydropower stations can regulate the fluctuations caused by wind and photovoltaic power. Constructing pumped-storage units between two upstream and downstream reservoirs is
With a total installed capacity of 1,200 MW, Shandong Yimeng PSH Station has installed four units with a single unit capacity of 300 MW and a rated head of 375 m.
The result shows the urgency of developing the PSPS in Chinese power systems that have given priority to thermal power, and the energy resources need the wide-range optimal allocation within the system. The development cycle of the pumped storage is long, and at least 8–10 years are needed from the planning to the completion.
Guangdong Meizhou PSH Station has a planned installed capacity of 2,400 MW and it was constructed in two phases. The total installed capacity of the first phase is 1,200 MW, and four units with a single unit capacity of 300 MW are installed, with a rated head of 400 m.
But only the hydropower station with the annual regulation performance and above has good load regulation capability. In China, this type of stations that can be developed are becoming less and less. As to the CFU, the large-capacity one can also meet the demand of the power grid for load regulation in theory.
2.Zhejiang Changlongshan PSH Station in China With a total installed capacity of 2,100 MW, the Zhejiang Changlongshan PSH Station has installed six units with a single unit capacity of 350 MW and a rated head of 710 m. It is the first time that two different rated speeds (500/600 rpm) of pumped-storage units are arranged in the same powerhouse.
With a total installed capacity of 1,200 MW, the first phase of Jiangxi Hongping PSH Station has four units with a single unit capacity of 300 MW and a rated head of 540 m. Hongping PSH Project has done a great job on seepage prevention under complex geological conditions.